Full house Construction with grey structure and finishing
Starting From 3600/sqft with all material and labor
 Finishing Items Checklist

 

  1.   Ceiling plus finishing; stylish designs as customized by professionals
  2.   Electric wiring
  3.   Marble or tile flooring range
  4.   Marble slabs on stair case and kitchen
  5.   Metal railing on staircase
  6.   Laminate floor in dining  if required
  7.   Base filling putty on walls
  8.   All doors of  Semi solid wood ) Except main Door ( Soild Main Door )
  9.   Laminate sheets back box front UV or glaza as decided
  10.   Cabinet plus plasma outfit in T.V lounge as decided (laminate sheet)
  11.   Kitchen back boxes of laminate sheets and front panels of solid wood also kitchen will include:-
  • Tiles on floor and wall
  • Marble slabs
  • Chrome fitting and accessories sonex/master as decided.
  • Hood designed with (laminate sheet front of solid wood)
  • Sink bowl stainless steel
  1.   Washroom tiles range
  2.   Marble vanities
  3.   Washroom accessories
  4.   Washroom accessories(
  5.   Chromed taps and fittings
  6.   Glass finished /extensive designed showers
  7.   Fall lights on ceiling
  8.   Switch plates
  9.   Fancy wall lights
  10.   Chandelier in drawing
  11.   Exterior lights/boundary wall/gate
  12.   Outside marble; garage terrace, Gali.
  13.   Paint work; plastic emulsion on walls and distemper on top
  14.   Polish and elfin varnish designed finishing on panel and woodwork
  15.   Outside giraffe /weather sheet
  16.   Metal paint on grills & gate & railing
  17.   Aluminum windows